Papers
Topics
Authors
Recent
Search
2000 character limit reached

Prior-Independent Mechanisms for Scheduling

Published 2 May 2013 in cs.GT and cs.DS | (1305.0597v1)

Abstract: We study the makespan minimization problem with unrelated selfish machines under the assumption that job sizes are stochastic. We design simple truthful mechanisms that under various distributional assumptions provide constant and sublogarithmic approximations to expected makespan. Our mechanisms are prior-independent in that they do not rely on knowledge of the job size distributions. Prior-independent approximation mechanisms have been previously studied for the objective of revenue maximization [Dhangwatnotai, Roughgarden and Yan'10, Devanur, Hartline, Karlin and Nguyen'11, Roughgarden, Talgam-Cohen and Yan'12]. In contrast to our results, in prior-free settings no truthful anonymous deterministic mechanism for the makespan objective can provide a sublinear approximation [Ashlagi, Dobzinski and Lavi'09].

Citations (37)

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.