Papers
Topics
Authors
Recent
Search
2000 character limit reached

On the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines

Published 24 Jul 2013 in cs.DS | (1307.6505v2)

Abstract: We consider a special case of the ordinary NP-hard two-machine flow shop problem with the objective of determining simultaneously a minimal common due date and the minimal number of tardy jobs. In [S. S. Panwalkar, C. Koulamas, An O(n2) algorithm for the variable common due date, minimal tardy jobs bicriteria two-machine flow shop problem with ordered machines, European Journal of Operational Research 221 (2012), 7-13.], the authors presented quadratic algorithm for the problem when each job has its smaller processing time on the first machine. In this note, we improve the running time of the algorithm to O(n log n) by efficient implementation using recently introduced modified binary tree data structure.

Citations (5)

Summary

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Authors (1)

Collections

Sign up for free to add this paper to one or more collections.