2000 character limit reached
NuSTORM μ Ring -- Design and Injection Optimization
Published 12 Feb 2015 in physics.acc-ph | (1502.03751v1)
Abstract: The design of the NuSTORM muon production beam line and storage ring is discussed. The facility includes a pion production target station with a pion collection horn and transport into a straight section of a storage ring. {\pi} decay within that straight section provides {\mu}'s that are stored within the ring for subsequent decay providing precision electron and muon neutrino beams. The ring and transport designs are described and optimized. Genetic Algorithm optimization of the horn and transport into the ring has been performed, providing a significant increase in intensity
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Top Community Prompts
Collections
Sign up for free to add this paper to one or more collections.