2000 character limit reached
Construction of power flow feasibility sets
Published 23 Jun 2015 in cs.SY | (1506.07191v3)
Abstract: We develop a new approach for construction of convex analytically simple regions where the AC power flow equations are guaranteed to have a feasible solutions. Construction of these regions is based on efficient semidefinite programming techniques accelerated via sparsity exploiting algorithms. Resulting regions have a simple geometric shape in the space of power injections (polytope or ellipsoid) and can be efficiently used for assessment of system security in the presence of uncertainty. Efficiency and tightness of the approach is validated on a number of test networks.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Top Community Prompts
Collections
Sign up for free to add this paper to one or more collections.