Abstract: We investigate a single machine rescheduling problem that arises from an unexpected machine unavailability, after the given set of jobs has already been scheduled to minimize the total weighted completion time. Such a disruption is represented as an unavailable time interval and is revealed to the production planner before any job is processed; the production planner wishes to reschedule the jobs to minimize the alteration to the originally planned schedule, which is measured as the maximum time deviation between the original and the new schedules for all the jobs. The objective function in this rescheduling problem is to minimize the sum of the total weighted completion time and the weighted maximum time deviation, under the constraint that the maximum time deviation is bounded above by a given value. That is, the maximum time deviation is taken both as a constraint and as part of the objective function. We present a pseudo-polynomial time exact algorithm and a fully polynomial time approximation scheme, the latter of which is the best possible given that the general problem is NP-hard.

Citations (1)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.