Integrated Facility Location and Production Scheduling in Multi-Generation Energy Systems
Abstract: In this paper, we investigate the energy system design problems with the multi-generation technologies, i.e., simultaneous generation of multiple types of energy. We propose a long-term planning model which integrates macro-level strategic decisions such as facility location and multi-generation technology investment, and micro-level operational decisions such as production planning and energy transportation. Our results illustrate the economic value of multi-generation technologies in lieu of the spatio-temporal demand uncertainty for energy. In particular, we show that the multi-generation technologies can reduce demand uncertainty by risk pooling both within and across different facilities.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Top Community Prompts
Collections
Sign up for free to add this paper to one or more collections.