Papers
Topics
Authors
Recent
Search
2000 character limit reached

Scheduling to Minimize Age of Information in Multi-State Time-Varying Networks with Power Constraints

Published 4 Aug 2019 in cs.IT, cs.NI, and math.IT | (1908.01334v6)

Abstract: In this paper, we study how to collect fresh data in time-varying networks with power constrained users. We measure data freshness from the perspective of the central controller by using the metric Age of Information, namely the time elapsed since the generation time-stamp of the freshest information. We wonder what is the minimum AoI performance the network can achieve and how to design scheduling algorithms to approach it. To answer these questions when scheduling decisions are restricted to bandwidth constraint, we first decouple the multi-user scheduling problem into a single user constrained Markov decision process (CMDP) through relaxation of the hard bandwidth constraint. Next we exploit the threshold structure of the optimal policy for the decoupled single user CMDP and obtain the optimum solution through linear programming (LP). Finally, an asymptotic optimal truncated policy that can satisfy the hard bandwidth constraint is built upon the optimal solution to each of the decoupled single-user sub-problem. The performance is verified through simulations. Our investigation shows that to obtain a small AoI performance, the scheduler exploits good channels to schedule users supported by limited power. Users equipped with enough transmission power are updated in a timely manner such that the bandwidth constraint can be satisfied.

Citations (25)

Summary

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.