Papers
Topics
Authors
Recent
Search
2000 character limit reached

Cost Analysis for Drone based 5G eMBB Provision to Emergency Services

Published 7 Nov 2019 in cs.NI | (1911.07635v1)

Abstract: There is growing interest in investigating how the 5G capabilities can be extended to the critical communications vertical, in an expedited time scale. This paper provides a comprehensive cost analysis of a drone-based 5G deployment solution for emergency services. The proposed deployment uses existing 4G and 5G ground small cells and the fronthaul, backhaul network. The cost analysis develops an analytical approach to minimize the Total Cost of Ownership (TCO), where the key parameters of drone unit cost, number of drones per link, and link capacity are jointly optimized. Our numerical analyses look at the TCO sensitivity to the above parameters to find sweet spots for deployment in different parameter combinations. The 3GPP centralization options are also investigated in terms of the TCO, and it is observed that centralization split points at higher layers benefit from lower TCO in this deployment model.

Citations (7)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.