Two-stage Planning for Electricity-Gas Coupled Integrated Energy System with CCUS Considering Carbon Tax and Price Uncertainty

Published 19 Jul 2021 in eess.SY and cs.SY | (2107.09127v2)

Abstract: In this article, we propose two-stage planning models for Electricity-Gas Coupled Integrated Energy System (EGC-IES), in which traditional thermal power plants (TTPPs) are considered to be retrofitted into carbon capture power plants (CCPPs), with power to gas (PtG) coupling CCPPs to gas system. The sizing and siting of carbon capture, utilisation and storage (CCUS)/PtG facilities, as well as the operation cost of TTPPs/CCPPs/gas sources/PtG, are all considered in the proposed model, including penalty on carbon emissions and revenue of CCUS. With changing policy on climate change and carbon emission regulation, the uncertainties of carbon price and carbon tax are also analysed and considered in the proposed planning model. The stochastic planning, and robust planning methods are introduced to verify mutually through economic and carbon indices. The proposed methods' effectiveness in reducing carbon emissions, increasing profit of CCUS from EGC-IES are demonstrated through various cases and discussions.

Citations (1)

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.