Papers
Topics
Authors
Recent
Search
2000 character limit reached

Reallocation Problems with Minimum Completion Time

Published 4 Nov 2021 in cs.DS | (2111.02579v1)

Abstract: Reallocation scheduling is one of the most fundamental problems in various areas such as supply chain management, logistics, and transportation science. In this paper, we introduce the reallocation problem that models the scheduling in which products are with fixed cost, non-fungible, and reallocated in parallel, and comprehensively study the complexity of the problem under various settings of the transition time, product size, and capacities. We show that the problem can be solved in polynomial time for a fundamental setting where the product size and transition time are both uniform. We also show that the feasibility of the problem is NP-complete even for little more general settings, which implies that no polynomial-time algorithm constructs a feasible schedule of the problem unless P$=$NP. We then consider the relaxation of the problem, which we call the capacity augmentation, and derive a reallocation schedule feasible with the augmentation such that the completion time is at most the optimal of the original problem. When the warehouse capacity is sufficiently large, we design constant-factor approximation algorithms under all the settings. We also show the relationship between the reallocation problem and the bin packing problem when the warehouse and carry-in capacities are sufficiently large.

Citations (1)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.