A polynomial-time approximation scheme for parallel two-stage flowshops under makespan constraint
Abstract: As a hybrid of the Parallel Two-stage Flowshop problem and the Multiple Knapsack problem, we investigate the scheduling of parallel two-stage flowshops under makespan constraint, which was motivated by applications in cloud computing and introduced by Chen et al. [3] recently. A set of two-stage jobs are selected and scheduled on parallel two-stage flowshops to achieve the maximum total profit while maintaining the given makespan constraint. We give a positive answer to an open question about its approximability proposed by Chen et al. [3]. More specifically, based on guessing strategies and rounding techniques for linear programs, we present a polynomial-time approximation scheme (PTAS) for the case when the number of flowshops is a fixed constant.
Paper Prompts
Sign up for free to create and run prompts on this paper using GPT-5.
Top Community Prompts
Collections
Sign up for free to add this paper to one or more collections.