Papers
Topics
Authors
Recent
Search
2000 character limit reached

Complexity of limit cycles with block-sequential update schedules in conjunctive networks

Published 21 Mar 2022 in cs.DM and cs.CC | (2203.11361v1)

Abstract: In this paper, we deal the following decision problem: given a conjunctive Boolean network defined by its interaction digraph, does it have a limit cycle of a given length k? We prove that this problem is NP-complete in general if k is a parameter of the problem and in P if the interaction digraph is strongly connected. The case where $k$ is a constant, but the interaction digraph is not strongly connected remains open. Furthermore, we study the variation of the decision problem: given a conjunctive Boolean network, does there exist a block-sequential (resp. sequential) update schedule such that there exists a limit cycle of length k? We prove that this problem is NP-complete for any constant k >= 2.

Citations (3)

Summary

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.