Papers
Topics
Authors
Recent
Search
2000 character limit reached

The Effects of Correctly Modeling Generator Step-Up Transformer Status in Geomagnetic Disturbance Studies

Published 23 Aug 2022 in eess.SY and cs.SY | (2208.11232v1)

Abstract: In order to correctly model the impacts of geomagnetically induced current (GIC) flows, the generator step-up (GSU) transformer status must be properly modeled. In power flow studies, generators are typically removed from service without disconnecting their GSU transformers since the GSU transformer status has little to no impact on the power flow result. In reality, removing a generator from service involves also removing its GSU transformer from service. This difference presents a discrepancy between simulated behavior and system observations during geomagnetic disturbance (GMD) events. This paper presents GMD case studies on 2000-bus and 24,000-bus systems in which reactive power losses and geomagnetically induced currents are compared across scenarios in which the GSU transformers for the disconnected generators are either in-service or out-of-service. The results demonstrate a 3.2 to 15.5 percent error in reactive power losses when the GSU status is modeled incorrectly. Discrepancies of up to 95 A per phase for branch GIC flows and 450 A for transformer neutral GIC flows are also observed and visualized.

Citations (2)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.