Papers
Topics
Authors
Recent
Search
2000 character limit reached

A Hierarchical Architecture for Optimal Unit Commitment and Control of an Ensemble of Steam Generators

Published 28 Jun 2023 in eess.SY and cs.SY | (2306.16119v1)

Abstract: A hierarchical architecture for the optimal management of an ensemble of steam generators is presented. The subsystems are coordinated by a multilayer scheme for jointly sustaining a common load. The high level optimizes the load allocation and the generator schedule, considering activation dynamics by a hybrid model. At the medium level, a robust tube-based model predictive control (MPC) tracks a time-varying demand using a centralized--but aggregate--model, whose order does not scale with the number of subsystems. A nonlinear optimization, at medium level, addresses MPC infeasibility due to abrupt changes of ensemble configuration. Low-level decentralized controllers stabilize the generators. This control scheme enables the dynamical modification of the ensemble configuration and plug and play operations. Simulations demonstrate the approach potentialities.

Citations (2)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.