Papers
Topics
Authors
Recent
Search
2000 character limit reached

Leveraging P90 Requirement: Flexible Resources Bidding in Nordic Ancillary Service Markets

Published 19 Apr 2024 in eess.SY and cs.SY | (2404.12807v1)

Abstract: The P90 requirement of the Danish transmission system operator, Energinet, incentivizes flexible resources with stochastic power consumption/production baseline to bid in Nordic ancillary service markets with the minimum reliability of 90%, i.e., letting them cause reserve shortfall with the probability of up to 10%. Leveraging this requirement, we develop a distributionally robust joint chance-constrained optimization model for aggregators of flexible resources to optimize their volume of reserve capacity to be offered. Having an aggregator of electric vehicles as a case study, we show how distributional robustness is key for the aggregator when making bidding decisions in a non-stationary uncertain environment. We also develop a heuristic based on a grid search for the system operator to adjust the P90 requirement and the level of conservativeness, aiming to procure the maximum reserve capacity from stochastic resources with least expected shortfall.

Citations (1)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We found no open problems mentioned in this paper.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 2 tweets with 10 likes about this paper.