Papers
Topics
Authors
Recent
Search
2000 character limit reached

Flow Shop Scheduling with Inter-Stage Flexibility and Blocking Constraints

Published 27 Nov 2024 in math.OC and cs.DM | (2411.18381v1)

Abstract: We investigate a scheduling problem arising from a material handling and processing problem in a production line of an Austrian company building prefabricated house walls. The addressed problem is a permutation flow shop with blocking constraints in which the machine of at least one stage can process a number operations of two other stages in the system. This situation is usually referred to as multi-task or inter-stage flexibility. The problem is in general NP-hard, but we derive a number of special cases that can be solved in polynomial time. For the general case, we present a variety of heuristic algorithms, with a focus on matheuristics that are grounded in two different mixed-integer linear programming (MIP) formulations of the problem. These matheuristics leverage the strengths of exact optimization techniques while introducing flexibility to address limits on computation time. To assess the performance of the proposed approaches, we conduct an extensive computational study on randomly generated test cases based on real-world instances.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 1 tweet with 0 likes about this paper.