Papers
Topics
Authors
Recent
Search
2000 character limit reached

Intent-driven scheduling of backup jobs

Published 25 Dec 2024 in cs.DC and cs.PF | (2501.14763v1)

Abstract: Job scheduling under various constraints to achieve global optimization is a well-studied problem. However, in scenarios that involve time-dependent constraints, such as scheduling backup jobs, achieving global optimization may not always be desirable. This paper presents a framework for scheduling new backup jobs in the presence of existing job schedules, focusing on satisfying intent-based constraints without disrupting current schedules. The proposed method accommodates various scheduling intents and constraints, and its effectiveness is validated through extensive testing against a variety of backup scenarios on real-world data from Veritas Netbackup customer policies.

Authors (2)

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 1 tweet with 0 likes about this paper.