Papers
Topics
Authors
Recent
Search
2000 character limit reached

Exploring Busy Period for Worst-Case Deadline Failure Probability Analysis

Published 28 Aug 2025 in cs.NI and cs.OS | (2509.10479v1)

Abstract: Busy period is a fundamental concept in classical deterministic real-time scheduling analysis. In this deterministic context, only one busy period - which starts at the critical instant - needs to be considered, which identifies the worst-case scenario and thus paves the way for the development of efficient and safe analysis techniques. However, a recent work has revealed that, in the context of \textit{probabilistic} real-time scheduling analysis, only considering critical instant is not safe. In this paper, we address this gap by systematically analyzing deadline miss probabilities across varying busy period starting points. We propose a novel method of Worst-Case Deadline Failure Probability (WCDFP) for probabilistic fixed-priority preemptive scheduling. Experimental results demonstrate significant improvements over state-of-the-art methods achieved by our proposed method.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.