Papers
Topics
Authors
Recent
Search
2000 character limit reached

Resource-dependent process times in hybrid flexible flowshops

Published 20 Oct 2025 in math.OC | (2510.18093v1)

Abstract: The effect of resource allocation on manufacturing motivates us to examine a scheduling variant that is of practical significance yet remains overlooked. We examine a Hybrid Flexible Flowshop (HFFS), i.e., an environment where a set of jobs is scheduled across multiple stages (each stage having multiple identical machines) yet some jobs may skip some stages. In addition, we consider processing times that depend on the resources assigned to a job at each stage, transportation times between machines and limited-capacity buffers before and after each stage. We introduce a Constraint Programming (CP) formulation, which we then decompose through Logic-Based Benders Decomposition (LBBD). We tighten formulations by a set of makespan lower bounds, the strongest of which arises from a reduction to malleable scheduling. By modifying recent instance generators, we experiment with up to 400 jobs, 8 stages, and 10 parallel machines per stage. The results demonstrate competitive integrality gaps, highlighting the efficiency of our approach at scale and on an HFFS variant quite beyond the current literature.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We found no open problems mentioned in this paper.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 1 tweet with 1 like about this paper.