Papers
Topics
Authors
Recent
Search
2000 character limit reached

Simulation-Based Validation of an Integrated 4D/5D Digital-Twin Framework for Predictive Construction Control

Published 5 Nov 2025 in cs.CE | (2511.03684v1)

Abstract: Persistent cost and schedule deviations remain a major challenge in the U.S. construction industry, revealing the limitations of deterministic CPM and static document-based estimating. This study presents an integrated 4D/5D digital-twin framework that couples Building Information Modeling (BIM) with natural-language processing (NLP)-based cost mapping, computer-vision (CV)-driven progress measurement, Bayesian probabilistic CPM updating, and deep-reinforcement-learning (DRL) resource-leveling. A nine-month case implementation on a Dallas-Fort Worth mid-rise project demonstrated measurable gains in accuracy and efficiency: 43% reduction in estimating labor, 6% reduction in overtime, and 30% project-buffer utilization, while maintaining an on-time finish at 128 days within P50-P80 confidence bounds. The digital-twin sandbox also enabled real-time "what-if" forecasting and traceable cost-schedule alignment through a 5D knowledge graph. Findings confirm that integrating AI-based analytics with probabilistic CPM and DRL enhances forecasting precision, transparency, and control resilience. The validated workflow establishes a practical pathway toward predictive, adaptive, and auditable construction management.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 1 tweet with 0 likes about this paper.