Papers
Topics
Authors
Recent
Search
2000 character limit reached

Study of laser-beam arrival time synchronization towards sub-picosecond stability level

Published 24 Dec 2025 in physics.acc-ph and physics.ins-det | (2512.21212v1)

Abstract: A precise synchronization between laser pulse and electron beam arrival time is essential for achieving sub-picosecond stability in modern accelerator facilities. In this work, a Low-Level RF system architecture combined with White Rabbit based timing system has been tested through a collaboration between KEK (Japan) and CNRS/IN2P3, IJClab (France). The setup combines a frequency standard generator, an IDROGEN carrier board with an embedded White Rabbit node, and SkyWorks synthesizers of different form factors to distribute phase-locked clock signals over telecommunication fiber. Phase noise power spectral density measurements were performed at several RF sub-harmonics to confirm synchronization performance. These results demonstrate the feasibility of implementing the White Rabbit-IDROGEN synchronization scheme for large-scale accelerators, including applications to laser-based diagnostics.

Summary

Paper to Video (Beta)

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.