Papers
Topics
Authors
Recent
Search
2000 character limit reached

Scheduling with Obligatory Tests

Published 24 Jun 2024 in cs.DS | (2406.16734v1)

Abstract: Motivated by settings such as medical treatments or aircraft maintenance, we consider a scheduling problem with jobs that consist of two operations, a test and a processing part. The time required to execute the test is known in advance while the time required to execute the processing part becomes known only upon completion of the test. We use competitive analysis to study algorithms for minimizing the sum of completion times for $n$ given jobs on a single machine. As our main result, we prove using a novel analysis technique that the natural $1$-SORT algorithm has competitive ratio at most 1.861. For the special case of uniform test times, we show that a simple threshold-based algorithm has competitive ratio at most 1.585. We also prove a lower bound that shows that no deterministic algorithm can be better than $\sqrt{2}$-competitive even in the case of uniform test times.

Summary

No one has generated a summary of this paper yet.

Paper to Video (Beta)

No one has generated a video about this paper yet.

Whiteboard

No one has generated a whiteboard explanation for this paper yet.

Open Problems

We haven't generated a list of open problems mentioned in this paper yet.

Continue Learning

We haven't generated follow-up questions for this paper yet.

Collections

Sign up for free to add this paper to one or more collections.

Tweets

Sign up for free to view the 1 tweet with 2 likes about this paper.